2023 Fee Schedule Crow Wing Township Planning and Zoning Department
***AFTER-THE-FACT LAND USE PERMIT APPLICATION FEES ARE FIVE TIMES THE ORIGINAL FEE***
New Construction: Residential:
Up to 1000 s.f. of Ground Cover: $250
1001 s.f. to 2000 s.f.Ground Cover: $500
2001 s.f. to 3000 s.f. Ground Cover: $750
3001 s.f. to 4000 s f Ground Cover: $1000
Each additional 1000 s.f. Ground Cover: $250
Commercial (including plan review fee)
Up to 1000 s.f. Ground Cover: $400
1001 s.f. to 2000 s.f. Ground Cover: $500
2001 s.f. to 5,000 s.f. Ground Cover: $750
5001 to 10,000 s.f. Ground Cover: $1000
10,001 s.f. and greater Ground Cover: $1250
Commercial Storage Building (no Sewer or Water) per building: $400
Additions/Accessory Structures
Residential Accessory Structure or Addition
200s.f. -400 s.f. Ground Cover: $125
401s.f. – 600 s.f. Ground Cover: $175
601 s.f. to 1000 s.f. Ground Cover: $250
1001 to 2000 s.f. Ground Cover: $300
Greater than 2000 s.f. Ground Cover: $500
Commercial Accessory Structure or Addition includes plan review fee
Up to 1000 s.f. Ground Cover: $300
1001 to 2000 s.f. Ground Cover: $400
2001 to 5,000 s.f. ground cover: $500
5001 to 10,000 s.f. Ground Cover: $750
10,001 s.f. and greater: $1000
Commercial multi-storage buildings-no water or sewer-(Per Building): $400
Agricultural Accessory Structures: $100
Seasonal Travel Trailer Placement: $100
Signs $1.00 per s.f. up to 200 s.f.: $200
Sewage Treatment Systems:
These Costs Are in Addition to Septic System Permit Fees:
Residential (Includes review, approval of design, and inspection): $200
Commercial (Prior Plan Approval Required)
Small Flow Systems (Less than 1000 gal/day): $350
Large Flow Systems (1000 1001-3999 gal. /day or larger): $600
Large Flow Systems (4000-6999 gal./day): $680
Large Flow Systems (7000-9999 gal/day): $840
All SSTS permit fees Includes review, approval of design, and inspection
Re-inspection Fee: $100
Dirt Moving in Shoreland Area
Sand Blanket in Shore Impact Zone* $150
Licenses/ Special Fees:
Gravel Pit Operation: $500
Plus Re-inspection Fee: $100
Plus Minimum: $5,000 Bond
Zoning Ordinance: $15
Comprehensive Plan: $25
Subdivision Ordinance: $5
Misc. Copies $.25 per page
ADMINISTRATIVE FEE $100 per hour plus mileage
Land Use Applications:Variance**
Residential/Commercial Uses: $500
Plus Recording Fee: $46
Conditional Use**
Residential/Commercial Uses: $500
Plus Recording Fee: $46
Amendment to Existing Conditional Use Permit** $500
**The above land use applications may be subject to construction permit costs previously listed
Zoning Map Amendment (Rezoning): $500
Dirt Moving/Fill Excavation (Variance): $500
Plus Recording Fee: $46
Plus Re-Inspection Fee: $100
Appeal to Board of Adjustment: $500
Plus Recording Fee: $46
Zoning Ordinance Amendment: $500+ Printing Costs
Subdivision Applications
Metes and Bounds: $100 + $25 per parcel
**Additional Fees include pass through cost of County Surveyor Review and Legal Review.
Plat or Planned Unit Development**
Initial Review by County Board: $250
Preliminary Plat: $500 + $25.00 per parcel
Final Plat: $500 + $25.00per parcel
+Surveyors Fees
TOWERS (Commercial Use)
Tower Base up to 1000 sq. ft.: $400
Tower Base 1001 sq. ft. to 2000 sq. ft.: $500
Antenna co-location: $300 per antenna
Equipment structures up to 1000 sq. ft.: $300
1001 to 2000 sq. ft.: $400
** Land Use Permits are required after approval.
** All new construction must have an E911 Address to obtain utility permits.
**Commercial Land Use Application, Plat/Planned Unit Development Review Costs
**The applicant shall reimburse the Township for all related miscellaneous costs that exceed the amount of the original application fee.
Crow Wing Township P&Z Fee Schedule Open Item